Version 1
    A Honeywell case study investigating how an automotive plant avoided a production crisis with the flip of a switch. Time is money for auto manufacturers, especially when you consider that a single faulty piece of equipment can cause production downtime valued at $10,000 per minute. Such was the case recently when an automotive manufacturing plant faced frequent disruptions to its assembly process due to a faulty safety switch on a production area door. The plant sought a permanent and effective remedy, and looked to Honeywell Sensing and Control to narrow its very small margin for error.